CropsTk 2.38 crore budgeted for outside soil, but Dinajpur canal bank is built from farmland
A Water Development Board contract at Parbatipur in Dinajpur set aside Tk 2,38,83,000 to bring about 59,708 cubic metres of earth from outside the project area to rebuild an irrigation canal bank. Instead, cropland on both banks is being dug 10 to 12 feet deep; the board confirmed the irregularity o
