The Bangladesh Agricultural Development Corporation’s "Joypurhat, Bogura and Gaibandha District Minor Irrigation Development Project (Part 1)", meant to raise the supply of surface water and ease pressure on groundwater in the three districts, has been approved. The Executive Committee of the National Economic Council (ECNEC) approved it at its meeting on 18 November, Dainik Bangla reports. It will run in 25 upazilas of the three districts from October 2026 to June 2030.
Mohammad Monirul Islam, the project’s focal point officer and BADC executive engineer in Bogura, said the project will bring modern irrigation to 21,505 hectares by re-excavating canals, building irrigation infrastructure and draining waterlogged beels, with a target of 139,782 tonnes of food grain.
The work includes re-excavating 300 km of irrigation and drainage canals; buying 350 sets of pumps and motors for electric low-lift pump, solar and deep tube-well schemes; building 155 hydraulic structures of various kinds; laying 35 km of RCC field paths for crop fields and char areas; and buying and installing 50 solar irrigation units.
According to Monirul Islam, BADC chairman Md Azizul Islam has said the most important thing about the project is to finish every part of it on time, with transparency and accountability, and to bring its benefits to farmers’ doorsteps without harassment.
The project is part of the government’s modern and smart farm management, the report says.
Photo: Power Division, Government of Bangladesh / Wikimedia Commons (CC BY-SA 4.0)
Source: Dainik Bangla


Comments
(0)